Page 44 - Solar Panels
P. 44

Q.PEAK-G4.1 290-305





        Q.ANTUM  solAr  ModUle


                    The new high-performance  module  Q.PEAK-G4.1  is the ideal solu-
                    tion for residential  buildings  thanks to its innovative  cell technology
                    Q.ANTUM.  The world-record  cell design  was  developed  to achieve
                    the best performance  under real conditions  – even with low radiation
                    intensity  and on clear, hot summer days.

                              Q.ANTUM  TECHNOLOGY:  LOw  LEvELizEd  COsT  Of ELECTriCiTY
                              Higher yield per surface  area and lower BOS  costs and  higher power
                              classes and an efficiency rate of up to 18.6 %.

                              iNNOvATivE  ALL-wEATHEr  TECHNOLOGY
                              Optimal yields, whatever  the weather  with excellent low-light
                              and temperature behaviour.

                              ENdUriNG HiGH PErfOrMANCE
                              Long-term  yield security  with Anti-PID  Technology ,
                                                                 1
                              Hot-Spot  Protect  and  Traceable  Quality  Tra.Q™.

                              ExTrEME wEATHEr rATiNG                                                   YIELD  SECURITY
                              High-tech  aluminium alloy frame,  certified for
                              high  snow  (5400 Pa)  and  wind loads  (4000 Pa).                       ANTI  PID  TECHNOLOG Y
                                                                                                       (APT )
                                                                                                       HOT-S PO T  PROTECT
                                                                                                       (HSP )
                              MAxiMUM COsT rEdUCTiONs                                                  TRACE ABL E   QUALIT Y
                              Up to 10 % lower logistics costs due to higher                           (TRA.Q  ™)
                              module capacity per box.
                                                                                                              MOD: 27898  phot on. inf o/laborat ory
                              A rELiAbLE  iNvEsTMENT                                    Quality  Tested
                              Inclusive 12-year  product  warranty  and 25-year  linear   ✓   high reliability    Best polycrystalline
                                                                                                      solar  module  2014
                                                                                        ✓   low degradation
                                                                                        ✓   frequent
                                                                                                        Q.PRO-G2  235
                              performance warranty .                                     product surveillance   174  modules  tested
                                                2
                                                                                         ID.  40032587


                                                                                       1  APT test conditions: Cells at -1500 V
                                                                                        against  grounde d,  with  conducti ve
                                                                                        metal  foil  covere d  module  surface,
                                                                                        25 °C, 168 h
                                                                                       2  See data sheet on rear for further
                    THE  idEAL  sOLUTiON  fOr:                                          information.
                         Rooftop arrays on
                         residential buildings















                                                                                                                                                                                     43 |
     P a g e
   39   40   41   42   43   44   45   46   47   48   49